Hi~welcome to shenzhen xinmu display technology co., ltd.!
2025-08-05 149
The newly installed large screen suddenly turned black? Boss Wang fell in love with this matter last week - he spent 20,000 yuan to replace the control card, and finally found that the card slot was installed and burned the motherboard! Today I will take you to find out the details that seem simple but cost countless money.
Misunderstanding 1: All interfaces can be plugged in
• A shopping mall plugged the power card into the signal slot and instantly burned 18 modules
• The voltage difference between different card slots is 3 times (5V/12V/48V mixed installation is fatal)
Misunderstanding 2: It's good to insert it
• The receiving card slot utilization rate exceeds 80%
• For every 1 card added, the system delay will be increased by 0.3 seconds.
Misunderstanding 3: Don't worry after inserting
• Coastal cities do not clean the slot for 3 months, and oxidation leads to poor contact
• The card angle deviation will be >2° and the screen will be intermittently black
Step 1: Distinguish the four major types of cards
| Card type | Appearance features | Safe plug-in and unplug |
|---|---|---|
| Send card | Blue heat sink + double net port | Disconnect the power first and then operate |
| Receive card | Green indicator array | I heard "click"" |
| Video processing card | Silver metal shell | 45° oblique plug lock |
| Power distribution card | Red high voltage warning sign | Insulated gloves must be worn |
Step 2: Reveal the secret of the gold installation position
• Outdoor screen: The slot is ≥20cm away from the edge of the screen (rainproof penetration)
• Floor tile screen: The slot is tilted upward by 15° (anti-step impact)
• Rental screen: Use quick disassembly buckle (save labor costs when replacing in 3 seconds)
Step 3: Anti-Impossible Design Verification
1. Quarterly maintenance three-piece set
→ Spray contacts with precision electronic cleaner (alcohol can corrode the coating)
→ The dust cover of the chuck must be installed (dust accumulation causes short circuit)
→ Check screw torque (0.6N·m is the most ideal)
2. Emergency situation handling
• Card heating hot hand: power off immediately and space the slot position
• Back screen of card insert: Use an eraser to clean the gold fingers (don't use sandpaper)
• Slot deformation: Stop use and replace the entire back panel (single repair is more expensive)
I have seen too many people fall into this matter. Last year, a concert in a stadium was too tight, and the screen was overheated after one hour of the performance. Not only did it pay the artist's penalty for liquidated damages, it also became a hot search. Now my team mandates:
The latest industry data shows that correct card insertion can reduce the failure rate by 58%, saving 48,000 yuan in five-year maintenance costs. Next time I see a worker inserting the card with bare hands and not wearing anti-static rings, so I will quickly show him this article!
for more product information and pricing, please contact us .