Hi~welcome to shenzhen xinmu display technology co., ltd.!

News Center

hotline:

13632760729

Where is the LED display switch? 3 scenario setting guide + save 30% debugging time

2025-08-18 149


​Why can't my LED screen switch be found? ​
Many users who are first exposed to LED displays will have this confusion. Unlike household appliances, the control system of professional display equipment often needs to match application scenarios - from shopping mall advertising large screens to stage floor tiles screens, the switch position design directly affects the safety of use and maintenance efficiency.

Where is the LED display switch? 3 scenario setting guide + save 30% debugging time

​Scene 1: "Hidden" switch design for regular advertising screens​
For fixed advertising screens installed on mall exterior walls or subway channels, more than 80% of the equipment uses​ ​Dual control mode​​:

  • ​Physical switch​ ​: Usually located in the maintenance port on the right side of the screen/bottom, the protective cover must be opened with a special key
  • ​Remote switch​ ​: Implementing timing switch through intelligent control system (supports APP/computer operation)
    ► ​​Notice​ ​: It is recommended to enable automatic brightness adjustment function (4000-7500cd/m² adaptive) for outdoor screens, which not only protects the screen life and saves more than 15% of energy consumption.

​Scene 2: "Intelligent Linkage" Settings of Creative Screens​
When encountering special displays such as transparent video walls, floor tiles, etc., the traditional physical switch may be completely cancelled:

  • ​Dance floor tiles screen​ ​: Linked with the lighting and audio system, unified switch through the center console
  • ​Transparent window screen​ ​: Adopt human body sensing + timing switch combination mode (day transmissibility remains 86%)
    ► ​​Experience sharing​ ​: A commercial complex project has reduced the debugging time by 30% through intelligent linkage settings and avoided the risk of accidental contact.

​Scenario 3: "modular" control system for engineering screens​
Rental, stadium and other engineering display screens usually use​ ​Quick disassembly design​​:

  • Integrated power supply main control switch on the side of the box (IP65 protection level)
  • Independent switches for each box + double guarantee for overall circuit breakers
    ► ​​Data Verification​ ​: The actual measurement shows that the modular switch design improves the installation efficiency by 40%, and facilitates continuous electrical operation during maintenance of a single box.

​3 must-check switch setting errors​

  1. ​Blindly pursue convenience​ ​: A brand has short-circuited water inlet due to external switches, and the maintenance cost has increased by 50%.
  2. ​Ignore brightness matching​ ​: The indoor screen has a long-term full brightness (>1200cd/m²) operation will accelerate the aging of the lamp beads
  3. ​Forgot software lock​ ​: Must set operation permissions for display screens in important places to avoid misoperation of non-professional personnel

​Industry cold knowledge​
The switching circuit design of professional-grade display screens must meet the high refresh rate requirements of 1920Hz, and ordinary electrical transformation may lead to signal delay. Recently, an international stadium has an accident of 17 seconds of screen out of synchronization due to illegal modification of the control system - this reminds us: the switch settings of the display device are not only basic operations, but also professional technology.

for more product information and pricing, please contact us .

Shenzhen New Screen Display Technology Co.Ltd