Are you also worried about finding an LED screen manufacturer? A project that was obviously quoted at 500,000 yuan online turned into 800,000 yuan when it was completed. ; It was agreed to be delivered within 45 days, but it took three months and still no electricity. Today I will pierce this layer of window paper for you—— Master these tips and you can save at least 150,000 in wasted money.。
Let’s first expose the tricks in the quotation
There was a shopping mall project last year, and the contract stated an "all-inclusive price" of 580,000 yuan. As a result, these expenses appeared during construction:
Remember this formula : Total price = screen price × 1.8. For example, a 100-square-meter P3 screen is quoted at 400,000 yuan, but the actual budget must be 720,000 yuan to be safe. Especially for transparent screens with a light transmittance of 86%, it is necessary to confirm whether the curtain wall modification is included.
The truth about project delays
For those who promise to complete the work in 45 days, 80% of them do not include these times:
There is a workaround: The manufacturer is required to produce the construction logs of the last three projects . For a company with a real monthly output of 10,000 square meters, the fastest time from order to shipment is 7 days. Especially for rental screens with magnesium-aluminum alloy boxes, the disassembly and assembly efficiency is 60% faster than that of traditional structures.
Word games in parameters
The "high-definition screen" that sales people talk about may be the obsolete P4 model. Here are three ways to check its authenticity:
The organizer of a music festival suffered a loss. The stage floor tile screen was rated for IP65 protection. However, it short-circuited and burned the control card on a rainy day, resulting in a loss of 180,000 performance fees.
Death test that must be done during acceptance
Don’t relax after paying the money. If you don’t do these three tests, you will regret it for ten years:
One company failed to conduct seismic tests, and the fence screen installed in the stadium was knocked crooked by a fan, resulting in a loss of 2.3 million in medical expenses. so IP65 protection + level 10 earthquake resistance is a life-saving combination。
Now let’s talk about some truths that the industry dare not tell: Those who dare to take urgent orders may not necessarily be capable people. . A manufacturer with a monthly output of 10,000 square meters can ship goods within 7 days because of its automated assembly line. ; And those small workshops that say "you can jump in line by paying extra" often dismantle other people's ordered parts for you to use. During the next work deadline, directly ask for a video to watch the real-time production line - real gold is not afraid of fire, and only those who can live broadcast the workshop are reliable.