Hi~welcome to shenzhen xinmu display technology co., ltd.!
2025-11-03 50
The core operation process is divided into three stages: hardware preparation, software configuration, and signal synchronization.:
Hardware connection check
Control system activation
The display requirements of different scenarios correspond to differentiated synchronization solutions.:
| Application scenarios | Recommended sync mode | Technical advantages |
|---|---|---|
| ad carousel | Timing command synchronization | Preset 10 playlists for automatic switching |
| Live event | frame sync mode | ≤3ms ultra-low latency to avoid dynamic smearing |
| stage interaction | AI dynamic adjustment | Automatically match the best parameters based on ambient brightness |
Advanced operations include three core steps:
Three rules to ensure stable operation:
Power on and off sequence specifications
Common troubleshooting table
| Phenomenon | Priority check items | solution |
|---|---|---|
| Black screen no signal | Graphics card driver version | Upgrade to Studio driver |
| Screen tearing | Sync frame rate settings | Enable vertical sync |
| Color distortion | Gamut profile | Switch to BT.709 standard |
Long-term maintenance strategy
Through standardized operating procedures and regular maintenance, the display performance of the LED synchronization screen can be maximized. In special scenarios, it is recommended to configure an intelligent temperature control system to ensure that core components operate in the optimal working range of 35-55°C.
for more product information and pricing, please contact us .